How to get a change order signed

A change order is a short signed document that records one change to work already agreed: what is different, what it costs and how it moves the schedule. Get it signed before you do the extra work, not after. The cheapest way is a one-page PDF, sent for signature the same day the client asks for the change.

Updated · 6 min read

Signavos: send a PDF for signature, pay only per document. Credits never expire.Try it free

What a change order is for

A change order is how contractors, agencies and freelancers handle the moment when a client says "while you are at it, can you also...". The original contract described a scope and a price. The change order amends both, in writing, with a signature. It stops the most common argument in project work: the client remembers the change as free, and you remember it as extra.

It is not a new contract. It is an addendum that points back to the original agreement and says which parts change. Everything it does not mention stays as it was. If your original paperwork was a quote, see how to get a quote or estimate signed online, which covers the acceptance block and deposits that come before any change.

This is general information, not legal advice. Whether a change order is required, and what it must say, depends on your original contract and, for some trades, on local rules. Check both.

What a change order should record

Keep it to one page if you can. A short document gets read, and a document that gets read gets signed.

The parts of a change order
PartWhat to writeWhy it matters
ReferenceTitle, date and number of the original contract, plus a change order number (CO-1, CO-2)Ties the change to the right agreement
DescriptionWhat is added, removed or altered, in plain wordsPrevents "I thought that was included"
Price effectThe amount added or deducted, and the new totalThe number is the point of the document
Schedule effectDays added or removed, or a new completion dateExtra work usually means extra time
Payment termsWhen the extra amount is due and how it is invoicedAvoids a second argument at the end
Everything elseA line saying all other terms of the original contract stay in forceKeeps the change narrow
SignaturesName, signature and date for the client and for youShows both sides agreed

Number every change order in sequence, even for small things. A job with five signed change orders and a clear running total is far easier to close out than one with three emails and a verbal yes.

Get it signed before the work, not after

The signature is worth the most before the extra work starts, because that is when the client still has a choice. After the work is done, a request to "sign off on the extra" feels like an invoice dispute. Before the work, it is a quick decision.

  • Urgent changes. If the work cannot wait, get a written yes by email first, then follow with the signed change order the same day. Say in the email what the change costs.
  • Small changes. Decide in advance what counts as small enough to skip. Many people set a threshold, such as any change that adds cost or days gets a change order.
  • Client-driven changes only. If the change fixes your own mistake, it is not a change order. It is a correction, and you absorb it.

How to send a change order for signature

  1. Write the change order as a one-page document and export it to PDF. Signavos takes PDF only, up to 40 MB. Run through the pre-send checklist for names, amounts and dates.
  2. Upload it and place a signature field for the client. Type the client's name into the signature block first if you want it printed.
  3. Enter the client's name and email address. Use the address the client already uses for the project.
  4. Send. One credit is debited at send. Drafting is free.
  5. Check the status on the document page. If it is opened but not signed, a short message from you does more than a system email. You can also resend the invitation.
  6. When it is signed, download the signed PDF and the Certificate of Completion and store them next to the original contract.

The client signs in their browser with no account and no app, on a phone or a laptop, which matters when the person asking for the change is standing on site. They can decline with a reason if the number is wrong, and you are notified.

If the original contract has two signers on the client side, such as a couple or two directors, add both as signers on the change order, for one credit. Each gets their own link and signs only their own fields. You sign as the other party by adding your own signature to the PDF before you send. How to send one document to multiple signers has the details.

Keep it with the original contract

A change order only works if you can find it later. File the signed PDF, the certificate and the original contract in one folder, named so they sort in order, for example "Smith kitchen - contract", "Smith kitchen - CO-1", "Smith kitchen - CO-2".

  • Running total. Keep a one-line list of the original price and each change order amount, so the final invoice adds up without a hunt.
  • Certificate of Completion. It shows who was sent the document, when it was opened and signed, and the SHA-256 checksum of the final PDF. See what a Certificate of Completion is.
  • Retention. Keep the whole set for as long as you would keep the original contract. How to store signed contracts so they hold up covers naming and backup.

Signavos produces a simple electronic signature with an append-only, hash-chained audit trail. It does not verify government ID, issue advanced or qualified signatures, or offer templates, so you rebuild your change order PDF each time or keep a master copy to edit.

What it costs

One send is one credit. Starter is 5 credits for $8.99, Regular is 40 for $19.99 ($0.50 a send) and Bulk is 200 for $89.99. Credits never expire and there is no subscription, so a job with four change orders costs four credits, and a quiet month costs nothing. Send a change order for signature and get the extra work agreed in writing.

Frequently asked questions

Do I need a change order for every small change?
Not always. A good rule is that any change affecting price or schedule gets a change order, and tiny adjustments with no cost can be confirmed by email. Check your original contract, which may require written changes.
Can I get a change order signed after the work is done?
You can ask, but it is harder. Once the work exists, the client may dispute the price. Getting the signature before you start is the point of a change order.
Is an emailed yes enough instead of a signature?
Sometimes an email can be evidence of agreement, but a signed change order with the amount and dates is clearer. See are email agreements legally binding?. This is general information, not legal advice.
Does the client need an account to sign?
No. On Signavos the client opens the emailed link in a browser and signs. No account or app is needed.
What if the client disagrees with the change order?
They can decline with a reason, and you are notified. Talk it through, correct the PDF, void the old request if it is still unsigned and send a new one.